1) To ensure that shore pilling work is done .
3) Providing and Fixing ISMB 400 OR Similar ISMB as Mentioned On Dwg .ie. Waler beam .
3) Waler beam components
•bracket plate
•ISMB
•Stifner plate
•Face plate
• Thrust plate
4) Start drilling work with proper line, level and angle (30°,45°,60°).
5) Insert casing pipe in the bore and drill it at required depth .
6) Wash the bore and insert tendons (12.7mm, 15.2mm, etc ). in the bore and grout it upto fixed length ie mentioned on dwg.
7) Provide and fix stiffner plate with box and face plate ,after 7 days tendons are stress properly to achieve laod capacity I.e ( 60 ton, 65 ton ,70 ton ).
8) Again grout this anchor with grouting chemical (ultratech NS2 ).
9) After stressing process anchor is completed .